Public roadmap

20 items, three-quarter horizon

What we're shipping next, plainly stated. Compliance certifications, programmatic-SEO scale-out, multimodal bot, cross-vertical handoff, open-source eval harness. Email [email protected] с requests — every email is read.

Backlog

5 items

  • Unscheduled Voice mode — visitor speaks к bot via mic
  • Unscheduled OpenAPI 3.1 spec autogenerated + Redocly rendered at /api/docs/spec/
  • Unscheduled Marketplace — third-party prompt templates per vertical
  • Unscheduled Affiliate program с public dashboard
  • Unscheduled Edge-deployed widget via Cloudflare Workers
Q1 2027

5 items

  • Planned SOC 2 Type II report — covering the 12-month audit window since Type I
  • Planned Cross-vertical bot handoff — med → fitness seamless routing когда query mismatches the vertical
  • Planned SCIM provisioning for SSO (Okta / Azure AD / OneLogin)
  • Planned Bot eval harness open-sourced — let customers reproduce the eval rubric internally
  • Planned Public changelog automation — RSS + Atom feeds + JSON-LD ItemList per release
Q3 2026

5 items

  • In flight SOC 2 Type I report — audit underway, target ship September
  • In flight Public bot-quality eval scoreboard with quarterly refresh (live at /en/eval/)
  • Planned Per-vertical /faq/ × 9 verticals × 3 langs (27 surfaces)
  • Planned Long-form deep-dive articles (5 per vertical, ~3000 words each)
  • Planned Streaming bot responses with inline citation interleave (sources shown as the answer streams)
Q4 2026

5 items

  • Planned ISO 27001 certification — gap analysis Q3, certification window Q4
  • Planned External penetration test (annual) — executive summary к Enterprise customers
  • Planned Multimodal bot — visitor uploads image (lab result, menu, document) и bot triages
  • Planned Arabic full-stack rollout (Pages/Ar/, RTL middleware, sitemap AR URLs, admin UI)
  • Planned Webhook events SDK с signature verification — npm @@slatech/webhook + pip slatech-webhook
FAQ

How the roadmap is maintained

On every quarterly review (1st of each quarter) и whenever а quarter's contents shift. Date stamps on each row reflect the last edit. Significant scope changes are noted в /en/changelog/.

Customer feedback drives most of the in-flight column. Email [email protected] с feature requests — every email is read и either incorporated, pushed к а later quarter, or declined с а reason. The public eval scoreboard (/en/eval/) is а recent example of а roadmap item that customers requested и we shipped within а sprint.

In flight (currently being built; target ship date inside the labelled quarter), Planned (scoped и scheduled but not yet started), Unscheduled (in the backlog, no committed quarter). Items are never removed silently — а deprecated item moves к the changelog с а reason.

No. This page is the canonical roadmap. Enterprise customers get а quarterly call с the founder где we walk through their account-specific timeline against this public roadmap, но there is no separate private feature list.

Roadmap missing what you need?

Email [email protected]. Every request gets а reply.